STEICOmulti cover 5

Processing STEICOmulti cover 5

  • Clean roof surface in advance and free from obstructions (nails and sharp objects)
  • Lay the membrane or sheet so that the printed side is facing the fitter
  • Lay the membrane or sheet parallel to the eaves with an overlap of at least 10 cm
  • Fix the membrane or sheet in place solely within the overlap area (e.g. clips)
  • Activate the longitudinal self-adhesive areas by removing the protective strip only after the membrane or sheet has been fixed in place
  • Component joints and penetrations must be made in an airtight manner by means of STEICO system accessories

    Product overview

    or choose combination

    Area of application
    Product group
    © 2020 STEICO SE