STEICO LVL X rimboard
Rimboards from laminated veneer lumber
Rimboards made of laminated veneer lumber with cross veneers
- Excellent dimensional stability: safe load transfer at storey interfaces, prevention of subsidence and compression folds in ETICS façades
- Slender cross-sections, high load-bearing
- Delivery with low residual moisture
- Composition with around 25% cross veneers
- Wood from responsible forestry - PEFC certified
Dimensions
Stripes
Stripes
Thickness [mm] |
Length [mm] |
Width [mm] |
Number/package [pcs.] | Number/pal. [pcs.] |
Coverage/pal. gross [m2] |
|---|---|---|---|---|---|
| 30 | 12000 | 220 | 50 | 40 | 3,170 |
| 30 | 12000 | 240 | 50 | 40 | 3,460 |
| 30 | 12000 | 300 | 40 | 32 | 3,460 |
Weight and Packaging
Stripes
Stripes
Thickness [mm] |
Length [mm] |
Width [mm] |
Weight/m² [kg] |
|---|---|---|---|
| 30 | 12000 | 220 | 600,00 |
| 30 | 12000 | 240 | 600,00 |
| 30 | 12000 | 300 | 600,00 |
Hinweise
Storage
- The product must be stored on a level, dry and load-bearing surface.
- During the construction and storage phases, STEICO LVL X must be protected from wetness and damp by taking appropriate measures.
- In the event of splash water, STEICO LVL X must be stored at a minimum distance of 30 cm above the ground.
- Changes in wood moisture content due to storage conditions are to be expected, as with solid softwood.
- When opening the packages, care must be taken to ensure the goods are stored safely.
- Damaged goods must not be used.
- Standard STEICO LVL X packages can weigh up to 4 t.
- Improper storage and exposure to moisture may result in changes to the cross-sectional dimensions due to swelling and shrinkage during subsequent re-drying.
Disposal
- Disposal of offcuts: EAK/AVV 030105, as wood and wood-based materials, waste wood category II
- Disposal following demolition: EAK/AVV 170201, as wood and wood-based materials, waste wood category II
Working
- It is worked in a similar way to solid softwood, using standard woodworking machinery.
Health and Safety
- Appropriate measures must be taken during cutting (dust extraction, dust mask)
Construction moisture
- Construction moisture, which arises, for example, from fresh screed, plaster or paint, should generally be removed by ventilation.
- Care should be taken to ensure that the air inside the building remains dry during the construction phase.
- Additional measures, such as the installation of dehumidifiers, are recommended.
Declaration of performance
Certificates quality management
Caption
other abbreviations
pal. Pallet
T&G Tongue and Groove
pac. Packaging
approx. Approximately
SE square edge
Pcs. Pieces