STEICOuniversal dry
Combined sarking, sheathing and render board
Insulating sarking, sheathing and render board - high stability even with low board thicknesses
- 4-fold function: cold protection, rain protection, wind protection, render board
- Can be used from 35 mm board thickness in conjunction with STEICO air-injected insulation
- Particularly economical – just one type of board for roof constructions (from 1880 mm in length) and rendered façades (from 40 mm in thickness)
- Particularly robust insulation board thanks to the high raw density
- Diffusion-open for increased structural safety
- Wood from responsible forestry - PEFC certified
Technical data sheet pdf
Technical Specifications
| Produced and supervised according to | EN 13171, EN 14964 |
| Board designation | WF – EN 13171 – T5 – DS(70,-)2 – CS(10\Y)200 – TR30 – WS1,0 – MU3, EN-14964-IL |
| Fire class (RTF) according to EN 13501-1 | E |
| Declared thermal conductivity | 0.043 W/(m*K) |
| Declared thermal resistance [(m²*K)/W] | 0,75(35) / 1,35(60) /1,85(80) / 2,30(100) (m²*K)/W |
| Density | 180 kg/m³ |
| Water vapour diffusion resistance factor µ | 3 |
| sd-value [m] | 0,11(35) / 0,18(60) /0,24(80) / 0,30(100) m |
| Outdoor exposure | 4 weeks |
| Short-term water absorption | ≤ 1.0 kg/m² |
| Specific heat capacity | 2.100 J/(kg*K) |
| Compressive strength at 10% compression δ10 | 0.20 N/mm² |
| Compression strength | ≥ 200 kPa |
| Tensile strength perpendicular to face | ≥ 30 kPa |
| Declared level of airflow resistance | ≥ 100 (kPa*s)/m² |
| Ingredients | wood fibre, polyurethane resin, paraffin wax |
Bonded carbon
During growth, trees absorb carbon dioxide (CO2) and split the molecule into carbon (C) and oxygen (O2). The carbon is bound in the wood. The amount of bound carbon (C) is therefore also referred to as CO2 equivalent (CO2eq). As long as the wood is used in the form of wood products, the carbon remains bound and is removed from the atmosphere.
Dimensions
For variable use on the construction site and for prefabrication
For variable use on the construction site and for prefabrication
Thickness [mm] |
Edge profile | Length [mm] |
Width [mm] |
Length net [mm] |
Width net [mm] |
Number/pal. [pcs.] |
Coverage/pal. gross [m2] |
Coverage/pal. net [m²] |
|---|---|---|---|---|---|---|---|---|
| 40 | T+G | 1880 | 600 | 1855 | 575 | 56 | 63,168 | 59,731 |
| 40 | T+G | 2230 | 600 | 2205 | 575 | 56 | 74,928 | 71,001 |
| 60 | T+G | 1880 | 600 | 1855 | 575 | 36 | 40,608 | 38,398 |
| 60 | T+G | 2230 | 600 | 2205 | 575 | 36 | 48,168 | 45,644 |
Pallet formats:
2230x600 mm ca. 2,25 x 1,20 x 1,21 - 1,28 m
1880x600 mm ca. 1,89 x 1,20 x 1,20 - 1,34 m
Weight and Packaging
For variable use on the construction site and for prefabrication
For variable use on the construction site and for prefabrication
Thickness [mm] |
Edge profile | Length [mm] |
Width [mm] |
Weight/m² [kg] |
Weight/pcs. [kg] | pac./pal. paper/cardboard (approx) [kg] | pac./pal. plastic (approx) [kg] | pac./pal. wood (approx) [kg] | Weight./pal. (approx.) [kg] |
|---|---|---|---|---|---|---|---|---|---|
| 40 | T+G | 1880 | 600 | 7,20 | 7,7 | 4,40 | 1,1 | 25,5 | 465 |
| 40 | T+G | 2230 | 600 | 7,20 | 9,1 | 0,05 | 4,3 | 28,6 | 550 |
| 60 | T+G | 1880 | 600 | 10,80 | 11,5 | 0,05 | 4,0 | 25,4 | 470 |
| 60 | T+G | 2230 | 600 | 10,80 | 13,7 | 0,05 | 4,3 | 28,6 | 530 |
Pallet formats:
2230x600 mm ca. 2,25 x 1,20 x 1,21 - 1,28 m
1880x600 mm ca. 1,89 x 1,20 x 1,20 - 1,34 m
Storage
- Store wood fibre boards horizontally, flat and dry
- Protect edges from damage
- Only remove the film packaging when the ambient climate is dry and keep the pallet packing label
- Maximum stacking height: 4 pallets
Disposal
Waste cuttings:
- Waste code according to 2014/955/EU: 03 01 05
Dismantling:
- Waste code according to 2014/955/EU: 17 02 01
Cutting
- The boards can be cut to size using the STEICOisoflex cut combi cutting table or a band saw, circular saw, jigsaw and other wood-cutting tools.
Occupational health and safety
- STEICO wood fibre boards can be walked on directly above a rafter or joist support, however they cannot be used as the primary walking surface
- To ensure that the roof can be walked on at all times, it is advisable to lay the battens at the same time.
- Additional fall protection (man safe systems) should be used in line with national guidelines
- Suitable protective measures must be taken when cutting the wood fibre insulation boards. (dust extraction, dust mask)
- HSE guidance on the safe cutting of timber and the management of wood dust should be followed
Building moisture
- Condensation on the side of the panel facing the room during the construction phase disrupts (hinders) the diffusion flow.
- Excess moisture caused by e.g. fresh screed, plaster, or paint must be removed by ventilation
- Dry air must be ensured inside the building during the construction phase.
Certificates quality management
pal. Pallet
T&G Tongue and Groove
pac. Packaging
approx. Approximately
SE square edge
Pcs. Pieces
UDP-A sarking and sheathing board type A