
STEICOmulti CAPclear
Self-adhesive weather protection membrane
Transparent, fully self-adhesive and airtight weather protection membrane
- Fully self-adhesive, reliably protects components from rain, outdoor exposure of up to 3 months possible
- High level of safety for installers thanks to anti-slip surface and transparent membrane (allows view of the substrate)
- Moisture variable - sd value of 0.3-2.7 m
- High adhesive strength thanks to double functional film
Technical data sheet
Characteristics
Production and designation | EN 13984 |
Fire class (RTF) according to EN 13501-1 | E |
Area weight [g/cm²] | 215 |
Temperature resistance [°C] | -40 / +70 |
Processing temperature [°C] | > -10, the surface must be dry and free of ice |
Max. tensile force longitudinal [N/5cm] | ≥ 200 |
Max. tensile force transverse [N/5cm] | ≥ 200 |
Elongation at Max. tensile force longitudinal [%] | ≥ 30 |
Elongation at Max. tensile force transverse [%] | ≥ 30 |
Tear resistance longitudinal [N] | ≥ 50 |
Tear resistance transverse [N] | ≥ 50 |
Resistance to water penetration | W1 |
Split silicone liner [cm] | 125/25 |
Outdoor exposure [weeks] | 12 |
Adhesive | Modified acrylate, solvent-free |
Dimensions
Article number | Length [mm] |
Width [mm] |
Area/roll [m²] | Coverage/pal. net [m²] | Number/pal. [pcs.] |
---|---|---|---|---|---|
424483 | 50000 | 1500 | 75 | 1875,000 | 25 |
Processing STEICOmulti CAPclear
- Substrates must be capable of bearing a load, dry and free from dust and grease
- Lay the membrane so that the printed side is facing the fitter
- STEICOmulti CAP has to be applied on the whole surface of the substrate (timber, wood-based material, masonry, concrete). It can be applied
horizontally or vertically. They need to have an overlap of at least 10 cm.
- Cut the membrane to required length, gradually remove the liner and adhere STEICOmulti CAP progressively at the beginning of the element.
- Align STEICOmulti CAP and gradually remove the liner and forcefully rub on the membrane
- Split release liner facilitates the bonding of corners, as initially only one liner can be removed
- Component joints and penetrations must be made in an airtight manner using STEICO system accessories
- Avoid standing water. Heavy rains should be evacuated from the building through drains.
- Process STEICOmulti CAP in span direction of the ceiling element.
- Local norms and regulations have to be observed.
(Please refer to the product data sheet for detailed information)
Declaration of performance