STEICOmulti membra 5
Vapour control membrane
- Optimised for diffusion-open timber construction, sd value of 5 m
- High tear resistance
- Robust and flexible: 3-layer, coated PP non-woven fabric, mesh reinforced
- Suitable for combination with air-injected insulation and batt insulation materials
Technical data sheet
Characteristics
| Production and designation | EN 13984: 2013 |
| Fire class (RTF) according to EN 13501-1 | E |
| Area weight [g/cm²] | 130 g |
| sd value [m] | 5,00 m |
| Temperature resistance | -40 / +80 °C |
| UV protection in non-installed state | 3 Monate |
| Max. tensile force longitudinal | ≥ 220 N/5 cm |
| Max. tensile force transverse | ≥ 190 N/5 cm |
| Elongation at Max. tensile force longitudinal | ≥ 10 % |
| Elongation at Max. tensile force transverse | ≥ 5 % |
| Tear resistance longitudinal | ≥ 210 N |
| Tear resistance transverse | ≥ 220 N |
Dimensions
| Article number | Length [mm] |
Width [mm] |
Area/roll [m²] | Coverage/pal. net [m²] | Number/pal. [pcs.] |
|---|---|---|---|---|---|
| 359300 | 50000 | 1500 | 75 | 1500,000 | 20 |
| 377339 | 50000 | 3000 | 150 | 3000,000 | 20 |
Processing STEICOmulti membra 5
- Lay the membrane or sheet so that the printed side is facing the fitter
- Lay the sheet parallel or at a right angle to the rafters wirh an overlap of at least 10 cm
- Ensure flush-processed bay insulation. There may be no cavities between the bay insulation and sheet/membrane. Visual check thanks to translucent character
- Fit the membrane or sheet in a tension-free manner and avoid creases
- Overlaps, component joints and penetrations must be made in an airtight manner by means of STEICO system accessories
- Additional mechanical fastening (e.g. battens) must be used immediately after installation to support the weight of the insulation
Processing in case of air-injected insulation:
- The distance between the clips to be used for fixing the vapour barrier in place on the supporting structure is max. 10 cm
- The use of STEICO fibreboard strips or an additional lath along the rafter is recommended as an alternative
- Before the introduction of the air-injected insulation, cross lathing must be arranged with a max. centre distance of 420 mm
- Once the insulation has been injected, seal the injection holes in an airthight manner using STEICOmulti tape P stickers
(Please refer to the product data sheet for detailed information)
Declaration of performance
System Recommendations
Similar Products